Sunday 10 June 2007

Moving swiftly on

No recent blogage as i've been running about like a blue arsed fly attending to the gosling. Since last update i've added the second fridge vent, completed the boarding, added an over-head locker above the cab, added trim between roof and walls, completed dressing around the windows, stuck carpet to exposed metal bits (it stops condensation), painted stuff and wall papered the walls. No time to talk, but here's some pics of progress so far.